What do a Plant's Full Load Hours signify?【SOLARMAN Business】

What do a Plant's Full Load Hours signify?【SOLARMAN Business】

Full Load Hours is a key indicator for evaluating the production capacity of a Photovoltaic Plant, with daily Full Load Hours representing daily production capacity. 
Calculation formula: Full Load Hours = Production / Installed Capacity
For example, if the daily Full Load Hours is 4.5h, it means this Plant operated at its Rated Power for 4.5 hours.